| 000 | 00694nam a2200205Ia 4500 | ||
|---|---|---|---|
| 001 | 93741 | ||
| 003 | BIBL | ||
| 005 | 20160527205243.0 | ||
| 008 | 900713s1967 nyu 000 0 spa d | ||
| 035 | _a(OCoLC)21996505 | ||
| 040 |
_aBKL _cSER |
||
| 041 | 1 |
_aspa _heng |
|
| 049 | _aPUXA | ||
| 100 | 1 | 0 |
_aMiller, Robert Wallace _9254083 _2Local |
| 245 | 1 | 0 |
_aAplicación del método PERT al control de programación, costes y beneficios. _cTraducción y adaptación: Leonardo Larios Aracama ... |
| 260 | 0 |
_aNew York _bMcGraw-Hill _c[1967] |
|
| 300 |
_a272 p. _c22 cm. |
||
| 500 | _aTranslation of Schedule, cost, and profit control with PERT. | ||
| 650 | 0 |
_aCritical path analysis _982268 _2Local |
|
| 999 |
_c76738 _d76738 |
||