| 000 | 02743cam a2200577 i 4500 | ||
|---|---|---|---|
| 001 | 001176423 | ||
| 003 | PUCPR | ||
| 005 | 20250218161350.0 | ||
| 008 | 220613s2022 vauab b f001 0 eng c | ||
| 010 | _a2022363264 | ||
| 035 |
_a(OCoLC)1329276288 _z(OCoLC)1336706563 |
||
| 040 |
_aGPO _beng _erda _cGPO _dGZN _dOCLCF _dDLC _dGPO |
||
| 042 | _apcc | ||
| 043 | _anwpr--- | ||
| 049 | _aBEV | ||
| 050 | 0 | 0 |
_aHV636 2017.P9 _bB43 2022 |
| 074 | _a0337 | ||
| 082 | _223 | ||
| 086 | 0 | _aD103.2:M33/2 | |
| 092 | _223 | ||
| 100 | 1 |
_aBea-Taylor, Jonah, _eauthor. |
|
| 245 | 1 | 0 |
_aGetting the lights back on : _bthe U.S. Army Corps of Engineers responds to Hurricane Maria, 2017-2018 / _cJonah Bea-Taylor. |
| 246 | 3 |
_aGetting the lights back on : _bthe United States Army Corps of Engineers responds to Hurricane Maria, 2017-2018 |
|
| 246 | 3 | 0 | _aU.S. Army Corps of Engineers responds to Hurricane Maria, 2017-2018 |
| 264 | 1 |
_aAlexandria, Virginia : _bOffice of History, Headquarters, U.S. Army Corps of Engineers, _c2022. |
|
| 300 |
_axvi, 208 pages : _bcolor illustrations, color maps ; _c25 cm. |
||
| 336 |
_atext _btxt _2rdacontent |
||
| 337 |
_aunmediated _bn _2rdamedia |
||
| 338 |
_avolume _bnc _2rdacarrier |
||
| 490 | 1 |
_aEP / U.S. Army Corps of Engineers ; _v870-1-79 |
|
| 500 | _aShipping list no.: 2022-0198-P | ||
| 504 | _aIncludes bibliographical references and index. | ||
| 505 | _aChapter 1: The disaster in historical context -- Chapter 2: The Storm, September 20, 2017 -- Chapter 3: The Corps responds to Maria, September-December, 2017 -- Chapter 4: The Beginning of the Grid Restoration Mission, September 2017-January 2018 -- Chapter 5: Procuring replacement parts, October 2017-January 2018 -- Chapter 6: The committed response to the longest blackout, January-May 2018 | ||
| 610 | 1 | 0 |
_aUnited States. _bArmy. _bCorps of Engineers _xCivil functions. |
| 610 | 1 | 7 |
_aUnited States. _bArmy. _bCorps of Engineers. _2fast |
| 650 | 0 | _aHurricane Maria, 2017. | |
| 650 | 0 |
_aElectric power systems _xNatural disaster effects _zPuerto Rico. |
|
| 650 | 0 |
_aElectric power failures _zPuerto Rico. |
|
| 650 | 7 |
_aArmed Forces _xCivil functions. _2fast |
|
| 650 | 7 |
_aElectric power failures. _2fast |
|
| 650 | 7 |
_aElectric power systems _xNatural disaster effects. _2fast |
|
| 651 | 7 |
_aPuerto Rico. _2fast |
|
| 710 | 1 |
_aUnited States. _bArmy. _bCorps of Engineers. _bOffice of History, _eissuing body. |
|
| 776 | 0 | 8 |
_iOnline version: _aBea-Taylor, Jonah. _tGetting the lights back on _w(OCoLC)1357098308 |
| 830 | 0 |
_aEP (Washington, D.C.) ; _v870-1-79. |
|
| 930 | 1 |
_lGPO01 _mBOOK _hD 103.2:M 33/2 _820220613 _f01 _gFDL220001863 |
|
| 942 |
_2sudocs _c21 |
||
| 999 |
_c303577 _d303577 |
||