000 01919nam a2200421 i 4500
001 on1164715624
003 OCoLC
005 20200902124559.0
006 m o d f
007 cr |||||||||||
008 200713s2020 dcua ob f000 0 eng c
040 _aGPO
_beng
_erda
_epn
_cGPO
_dMvI
042 _apcc
043 _an-us---
074 _a1040-C (online)
086 0 _aY 4.EN 2:S.HRG.115-531
099 _aY 4.EN 2:S.HRG.115-531
110 1 _aUnited States.
_bCongress.
_bSenate.
_bCommittee on Energy and Natural Resources,
_eauthor.
245 1 3 _aAn examination of blackstart, the process for returning energy to the power grid after a system-wide blackout, and other system restoration plans in the electric utility industry :
_bhearing before the Committee on Energy and Natural Resources, United States Senate, One Hundred Fifteenth Congress, second session, October 11, 2018.
264 1 _aWashington :
_bU.S. Government Publishing Office,
_c2020.
300 _a1 online resource (iii, 152 pages) :
_billustrations.
336 _btxt
337 _bc
_2rdamedia
338 _bcr
_2rdacarrier
490 1 _aS. hrg. ;
_v115-531
588 _aDescription based on online resource; title from PDF title page (govinfo, viewed July 13, 2020).
504 _aIncludes bibliographical references.
500 _aGPO Cataloging Record Distribution Program (CRDP).
650 0 _aElectric power failures
_zUnited States.
650 0 _aElectric power systems
_xReliability.
650 0 _aElectric power distribution
_zUnited States.
650 0 _aElectric utilities
_xSecurity measures
_zUnited States.
650 0 _aEmergency management
_zUnited States.
655 7 _aLegislative hearings.
_2lcgft
810 1 _aUnited States.
_bCongress.
_bSenate.
_tS. hrg. ;
_v115-531.
856 4 0 _uhttps://purl.fdlp.gov/GPO/gpo141285
922 _aBIBCONEW
_b20200713
999 _c294840
_d294840