000 02261nam a2200409Ia 4500
001 282480
003 OCoLC
005 20160527200422.0
008 061013s2006 dcua f000 0 eng c
010 _a 2006475221
035 _a(OCoLC)72846172
040 _aNSF
_cNSF
_dGPO
_dDLC
_dAFQ
_dIAK
042 _apcc
043 _an-us---
049 _aPUXA
050 0 0 _aTL785.8.L3
_bR457 2006
074 _a1005-C
074 _a1005-C (online)
082 0 0 _a387.80973
_222
086 0 _aY 10.2:SP 1/2
100 1 _aRehmus, Paul B.
_2Local
_9157985
245 1 0 _aAlternatives for future U.S. space-launch capabilities.
246 3 _aAlternatives for future United States space launch capabilities
260 _a[Washington, D.C.]
_bCongress of the U.S., Congressional Budget Office
_c[2006]
300 _axv, 55 p.
_bill.
_c28 cm.
490 2 _aA CBO study
_2Local
_947990
500 _a"Paul B. Rehmus wrote the study ... " -- Pref.
500 _a"October 2006."
500 _aShipping list no.: 2007-0044-P.
530 _aAlso available via Internet from CBO web site. Address as of 11/7/06: http://www.cbo.gov/ftpdocs/76xx/doc7635/10-09-SpaceLaunch.pdf; current access available via PURL.
504 _aIncludes bibliographical references.
505 0 _aCurrent capabilities and plans. Current launch capabilities and projected worldwide demand through 2020 ; Launch requirements for the vision for space exploration. -- Alternatives for future NASA manned space-exploration capabilities. Existing heavy-lift launch systems ; Close derivatives of existing systems ; New super-heavy launch vehicles ; Program cost comparisons. -- On-orbit assembly, launch vehicle reliability, and overall probability of mission success. -- Human safety on launch abort. -- Considerations that affect lunar missions executed using multiple launches. -- Schematic depictions of launch vehicle derivatives and their antecedents. -- Cost estimates for alternative launch systems.
650 0 _aLaunch vehicles Astronautics
_zUnited States.
_2Local
_9123614
710 1 _aUnited States
_bCongressional Budget Office.
_2Local
_9182913
856 4 _uhttp://www.cbo.gov/ftpdocs/76xx/doc7635/10-09-SpaceLaunch.pdf
856 4 1 _uhttp://purl.access.gpo.gov/GPO/LPS75737
999 _c203623
_d203623