Carta de fecha 25 de febrero de 2011 dirigida al Presidente de la Quinta Comisión por el Presidente del Grupo de trabajo de 2011 sobre el equipo de propiedad de los contingentes.
- [New York] UN 2 Mar. 2011
- 120 p. tables 28 cm.
Annexes (p. 52-120): 1. 1.1-1.2 [2011 COE Manual: Chapter 8, annex A] -- 2. 2011 COE Manual: Chapter 8, annex B, Revised reimbursement rates for self-sustainment -- 3. 3.1-3.4 [2011 COE Working Group: Approved special cases of major equipment, as at 19 January 2011 (category 1-4)] -- 4. 2011 COE Working Group: Guidance document on responsibilities under minor engineering -- 5. 5.1-5.2 [2011 COE Working Group] -- 6. 2011 COE Working Group: Definition and composition of level II plus medical facility additional capability modules -- 7. 7.1-7.9 [2011 COE Working Group].
Transmits, in his capacity as Chair of the 2011 Working Group on Contingent-Owned Equipment, report of the Working Group, dated 25 Feb. 2011.
UN. General Assembly. 5th Committee. 2011 Working Group on Contingent-Owned Equipment Work organization UN. General Assembly. 5th Committee. 2011 Working Group on Contingent-Owned Equipment Recommendations
Manual on Policies and Procedures Concerning the Reimbursement and Control of Contingent-Owned Equipment of Troop/Police Contributors Participating in Peacekeeping Missions (2008)
Peacekeeping Operations Manuals. Reimbursement Equipment and supplies.