<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>26204nam a2200445   4500</leader>
  <controlfield tag="003">pucpr</controlfield>
  <controlfield tag="005">20250214163834.0</controlfield>
  <controlfield tag="008">190725b2002       pe||| |||| 00| 0 eng d</controlfield>
  <datafield tag="010" ind1=" " ind2=" ">
    <subfield code="a">  2002410452</subfield>
  </datafield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">0160673895 </subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">pucpr</subfield>
    <subfield code="b">ENG</subfield>
    <subfield code="e">rda</subfield>
    <subfield code="c">pucpr</subfield>
    <subfield code="d">pucpr</subfield>
  </datafield>
  <datafield tag="043" ind1=" " ind2=" ">
    <subfield code="a">n-us-ny</subfield>
  </datafield>
  <datafield tag="049" ind1=" " ind2=" ">
    <subfield code="a">cicdf</subfield>
  </datafield>
  <datafield tag="050" ind1="0" ind2="0">
    <subfield code="a">HD7293</subfield>
    <subfield code="b">L5567 2002</subfield>
  </datafield>
  <datafield tag="074" ind1=" " ind2=" ">
    <subfield code="a">0556-C</subfield>
  </datafield>
  <datafield tag="086" ind1="0" ind2=" ">
    <subfield code="a">FEM 1.2 : W 89</subfield>
  </datafield>
  <datafield tag="092" ind1="0" ind2=" ">
    <subfield code="a">720.4837471</subfield>
    <subfield code="b">W92711</subfield>
    <subfield code="2">22</subfield>
  </datafield>
  <datafield tag="245" ind1="0" ind2="0">
    <subfield code="a">World Trade Center building performance study :</subfield>
    <subfield code="b">data collection, preliminary observations, and recommendations</subfield>
    <subfield code="c">[report editor, Therese McAllister ; chapter leaders and authors, Gene Corley ... et al.]</subfield>
    <subfield code="h">txt</subfield>
  </datafield>
  <datafield tag="264" ind1=" " ind2=" ">
    <subfield code="a">Washington, DC</subfield>
    <subfield code="b">Federal emergency management agency</subfield>
    <subfield code="c">2002</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">1 v. (various pagings)</subfield>
    <subfield code="b">col. ill.</subfield>
    <subfield code="c">28 cm</subfield>
    <subfield code="f">book</subfield>
  </datafield>
  <datafield tag="336" ind1=" " ind2=" ">
    <subfield code="2">rdacontent</subfield>
    <subfield code="b">txt</subfield>
    <subfield code="a">text</subfield>
  </datafield>
  <datafield tag="337" ind1=" " ind2=" ">
    <subfield code="2">rdamedia</subfield>
    <subfield code="b">n</subfield>
    <subfield code="a">unmediaded</subfield>
  </datafield>
  <datafield tag="338" ind1=" " ind2=" ">
    <subfield code="2">rdacarrier</subfield>
    <subfield code="b">nc</subfield>
    <subfield code="a">volume</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">"Produced by Greenhorne &amp; O' Mara, Inc. (G&amp;O) under contract EMW-99-CO-0267"- - T.p. verso</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Includes bibliographical references</subfield>
  </datafield>
  <datafield tag="505" ind1=" " ind2=" ">
    <subfield code="a">Table of Contents:
Executive Summary --
1 Introduction --
1.1 Purpose and Scope of Study 1-1 --
1.2 WTC Site 1-2 --
1.3 Timeline and Event Summary 1-4 --
1.4 Response of the Engineering Community 1-8 --
1.4.1	Local Authorities 1-8 --
1.4.2	SEAoNY Participation 1-10 
1.5 Overview of Building Codes and Fire Standards 1-15 --
1.5.1	Building Codes 1-15 --
1.5.2	Unusual Building Loads 1-16 --
1.5.3	Overview of Fire Structure Interaction 1-17 --
1.5.3.1 ASTM E119 Standard Fire Test 1-18 --
1.5.3.2 Performance in Actual Building Fires 1-18 --
1.6 Report Organization 1-20 --
1.7 References 1-21 --
2 WTC 1 and WTC 2 --
2.1 Building Descriptions 2-1  --
2.1.1	General 2-1  --
2.1.2	Structural Description 2-1 --
2.1.3	Fire Protection --
2.1.3.1 Passive Protection 2-12 --
2.1.3.2 Suppression 2-12 --
2.1.3.3 Smoke Management 2-13  --
2.1.3.4 Fire Department Procedures 2-13 --
2.1.4	Emergency Egress 2-13 --
2.1.5	Emergency Power 2-14 --
2.1.6	Management Procedures 2-14 --
2.2	Building Response 2-15 --
2.2.1	WTC 1 2-15 --
2.2.1.1 Initial Damage From Aircraft Impact 2-15 --
2.2.1.2 Fire Development 2-15 --
2.2.1.3 Evacuation 2-21 --
2.2.1.4 Structural Response to Fire Loading 2-24 --
2.2.1.5 Progression of Collapse 2-27 --
2.2.2	WTC 2 2-27 --
2.2.2.1 Initial Damage From Aircraft Impact 2-27 --
2.2.2.2 Preliminary Structural Analysis 2-32 --
2.2.2.3 Fire Development 2-34 --
2.2.2.4 Evacuation 2-35 --
2.2.2.5 Initiation of Collapse 2-35 --
2.2.2.6 Progression of Collapse 2-35 --
2.2.3	Substructure 2-35 --
2.3 Observations and Findings 2-36 --
2.4 Recommendations 2-39 --
2.5 References 2-40 --
3 WTC 3 --
3.1 Design and Construction Features 3-1 --
3.2 1993 Attack 3-5 --
3.3 2001 Attacks 3-5 --
3.3.1	Fire and Evacuation 3-5 --
3.3.2	Building Response 3-6 --
3.4 Observations 3-8 --
3.5 Recommendations 3-8 --
3.5 References 3-8 --
4 WTC 4 , 5, and 6 --
4.1 Design and Construction Features 4-1 --
4.1.1 Structural Design Features 4-1 --
4.1.2 Fire Protection Features 4-2 --
4.2 Building Loads and Performance 4-4 --
4.2.1 Impact Damage to WTC 5 4-7 --
4.2.2 Fire Damage 4-9 --
4.3 Analysis of Building Performance 4-10 --
4.3.1 Steel and Frame Behavior 4-10 --
4.3.2 WTC 5 Local Collapse Mechanisms 4-12 --
4.4 Observations and Findings 4-16 --
4.5 Recommendations 4-21 --
4.6 References 4-21 --
5 WTC 7 --
5.1 Introduction 5-1 --
5.2 Structural Description 5-3 --
5.2.1 Foundations 5-3 --
5.2.2 Structural Framing 5-4 --
5.2.3 Transfer Trusses and Girders 5-4 --
5.2.4 Connections 5-8 --
5.3 Fire Protection Systems 5-10 --
5.3.1 Egress Systems 5-10 --
5.3.2 Detection and Alarm 5-10 --
5.3.3 Compartmentalization 5-11 --
5.3.4 Suppression Systems 5-12 --
5.3.5 Power 5-13 --
5.4 Building Loads 5-13 --
5.5 Timeline of Events Affecting WTC 7 on September 11 , 2001 5-16 --
5.5.1 Collapse of WTC 2 5-16 --
5.5.2 Collapse of WTC 1 5-16 --
5.5.3 Fires at WTC 7 5-20
5.5.4 Sequence of WTC 7 Collapse 5-23 --
5.6 Potential Collapse Mechanism 5-24 --
5.6.1 Probable Collapse Initiation Events 5-24 --
5.6.2 Probable Collapse Sequence 5-30 --
5.7 Observations and Findings 5-31 --
5.8 Recommendations 5-32 --
5.9 References 5-32 --
6 Bankers Trust Building --
6.1 Introduction 6-1 --
6.2 Building Description 6-1 --
6.3 Structural Damage Description 6-4 --
6.4 Architectural Damage Description 6-6 --
6.5 Fireproofing 6-10 --
6.6 Overall Assessment 6-10 --
6.7 Analysis 6-11 --
6.7.1 Key Assumptions 6-12 --
6.7.2 Model Refinement 6-12 --
6.7.3 Simulation of Nonlinear Behavior 6-13 --
6.7.4 Connection Details 6-13 --
6.7.5 Connection Behavior 6-14 --
6.8 Observations and Findings 6-15 --
6.9 Recommendations 6-16 --
6.10 References 6-16 --
7 Peripheral Buildings --
7.1 Introduction 7-1 --
7.2 World Financial Center 7-4 --	 
7.2.1 The Winter Garden 7-4 --
7.2.2 WTC 3, American Express Building 7-5 --
7.3 Verizon Building 7-7 --
7-4 30 West Broadway 7-13 --
7.5 130 Cedar Street 7-14 --
7.6 90 West Street 7-15 --
7.7 45 Park Place 7-17 --
7.8 One Liberty Plaza 7-17 --
7.9 Observations and Findings 7-19 --
7.10 Recommendations 7-19 --
7.11 References 7-19 --
8 Observations, Findings, and Recommendations --
8.1 Summary of Report Observations , Findings and Recommendations 8-1 --
8.2 Chapter Observations , Findings , and Recommendations 8-2 --
8.2.1 Chapter 1 : Building Codes and Fire Standards 8-2 --
8.2.2 Chapter 2. WTC 1 and WTC 2 8-2 --
8.2.2.1 Observations and Findings 8-2 --
8.2.2.2 Recommendations 8-5 --
8.2.3 Chapter 3: WTC 3 8-6 --
8.2.3.1 Observations 8-6 --
8.2.3.2 Recommendations 8-6 --
8.2.4 Chapter 4: WTC 4 , 5 , and 6 8-6 --
8.2.4.1 Observations and Findings 8-6 --
8.2.4.2 Recommendations 8-7 --
8.2.5 Chapter 5: WTC 7 8-7 --
8.2.5.1 Observations and Findings 8-7 --
8.2.5.2 Recommendations 8-8 --
8.2.6 Chapter 6: Bankers Trust 8-8 --
8.2.6.1 Observations and Findings 8-8 --
8.2.6.2 Recommendations 8-9 --
8.2.7 Chapter 7: Perpheral Buildings 8-10 --
8.2.7.1 Observations and Findings 8-10 --
8.2.7.2 Recommendations 8-10 --
8.2.8 Appendix C: Limited Metallurgical Examination 8-10 --
8.2.8.1 Observations and Findings 8-10 --
8.2.8.2 Recommendations 8-11 --
8.3 Building Performance Study Recommendations for Future Study 8-11 --
8.3.1 National Response 8-11 --
8.3.2 Interaction of Structural Elements and Fire 8-11 --
8.3.3 Interaction of Professions in Design 8-12 --
8.3.4 Fire Protection Engineering Discipline 8-12 --
8.3.5 Building Evacuation 8-12  --
8.3.6 Emergency Personnel  8-12 --
8.3.7 Education of Stakeholders 8-13 --
8.3.8 Study Process 8-13 --
8.3.9 Archival Information . 8-13 --
8.3.10 SEANY Structural Engineering Emergency Response Plan 8-13  --
A Overview of Fire Protection in Buildings --
A.1 Introduction A.2 Fire Behavior  A-1 --
A.2.1 Burning Behavior of Materials A-1 --
A.2.2 Stages of Fire Development  A-1 --
A.2.3 Behavior of Fully Developed Fires A-4 --
A.3 Structural Response to Fire A-4 --
A.3.1 Effect of Fire on Steel A-5 --
A.3.1.1 Introduction A-5 --
A.3.1.2 Evaluating Fire Resistance . A-5 --
A.3.1.3 Response of High-rise, Steel-frame Buildings in Previous Fire Incidents A-6 --
A.3.1.4 Properties of Steel A-9 --
A.3.1.5 Fire Protection Techniques for Steel A-10 --
A.3.1.6 Temperature Rise in Steel A-14 --
A.3.1.7 Factors Affecting Performance of Steel Structures in Fire A-14 --
A.3.2 Effect of Fire on Concrete A-17 --
A.3.2.1 General A-19 --
A.3.2.2 Properties of Lightweight Concrete A-19 --
A.3.3 Fire and Structural Modeling A-19 --
A.4 Life Safety A-22  --
A.4.1 Evacuation Process A-23 --
A.4.2 Analysis , A-24 --
A.5 References A-24 --
B Structural Steel and Steel Connections A-26 --
B.1 Structural Steel B-1 --
B.2 Mechanical Properties B-2 --
B.3 WTC 1 and WTC 2 Connection Capacity B-4 --
B.3.1 Background B-4 --
B.3.2 Observations B-5 --
B.3.3 Connectors B-5 --
B.4 Examples of WTC 1 and WTC 2 Connection Capacity B-7 --
B.4.1 Bolted Column End Plates B-7 --
B.4.2 Bolted Spandrel Connections B-8 --
B.4.3 Floor Truss Seated End Connections at Spandrel Beam and Core B-9 --
B.4.4 WTC 5 Column-tree Shear Connections B-12 --
B.5 References B-14 --
C Limited Metallurgical Examination C-1 --
C.1 Introduction C.2 Sample 1 (From WTC 7) C-1 --
C.3 Summary for Sample 1 C-5 --
C.4 Sample 2 (From WTC 1 or WTC 2) C-5 --
C.5 Summary for Sample 2 C-13 --
C.6 Suggestions for Future Research. C-13 --
D WTC Steel Data Collection D-1 --
D.1 Introduction D-1 --
D.2 Project Background D-2 --
D.3 Methods. D-2 --
D.3.1 Identifying and Saving Pieces D-5 --
D.3.2 Documenting Pieces D-8 --
D.3.3 Getting Coupons D-10 --
D.4 Data Collected D-13 --
D.5 Conclusions and Future Work D-13 --
D.6 References Aircraft Information General Specifications E-1 --
F Structural Engineers Emergency Response Plan  --
G Acknowledgments --
H Acronyms and Abbreviations --
I Metric Conversions --
Tables  --
Table 1.1 Timeline of Major Events 1-10 --
Table 2.1 Estimated Openings in Exterior Walls of WTC 1 2-23 --
Table 5.1 WTC 7 Tenants 5-2 --
Table 5.2 WTC 7 Fuel Distribution Systems 5-14 --
Table 7.1 DoB/SEANY Cooperative Building Damage Assessment - November 7, 2001 7-3 --
Table A.1 Peak Heat Release Rates of Various Materials ( NFPA 92B and NFPA 72 ) A-3 --
Table A.2 Fire Duration in Previous Fire Incidents in Steel-frame Buildings A-10 --
Table A.3 Critical Temperatures for Various Types of Steel A-15 --
Table A.4 Test Methods for Spray-applied Fireproofing Materials A-18 --
Figures --
Chapter 1  --
Figure 1-1 WTC site map 1-3 --
Figure 1-2 Approximate flight paths of aircraft 1-5 --
Figure 1-3 WTC impact locations and resulting fireballs 1-5 --
Figure 1-4 Areas of aircraft debris impact 1-6 --
Figure 1-5 Fireball erupts on the north face of WTC 2 as United Airlines Flight 175 strikes the building 1-7 --
Figure 1-6 View of the north and east faces showing fire and impact damage to both towers 1-7 --
Figure 1-7 Schematic depiction of areas of collapse debris impact, based on aerial photographs and documented damage 1-9 --
Figure 1-8 Seismic recordings on east-west component at Palisades , NY , for events 1-9 at WTC on September 11 , 2001 , distance 34 km 1-11 --
Figure A Satellite photograph of the WTC site taken before the attacks. 1-12 --
Figure 1-9B Satellite photograph of the WTC site taken after the attacks 1-13 --
Figure 1-10 Comparison of high-rise building and aircraft sizes 1-19 --
Chapter 2  --
Figure 2-1 Representative floor plan (based on floor plan for 94th and 95th floors of WTC 1) 2-2 --
Figure 2-2 Representative structural framing plan, upper floors. 2-4 --
Figure 2-3 Partial elevation of exterior bearing-wall frame showing exterior wall module construction 2-6 --
Figure 2-4 Base of exterior wall frame 2-7 --
Figure 2-5 Structural tube frame behavior 2-7  --
Figure 2-6 Floor truss member with details of end connections 2-8 --
Figure 2-7 Erection of prefabricated components, forming exterior wall and floor deck units 2-9 --
Figure 2-8 Erection of floor framing during original construction. 2-9 --
Figure 2-9 Cross-section through main double trusses, showing transverse truss. 2-9 --
Figure 2-10 Outrigger truss system at tower roof. 2-10 --
Figure 2-11 Location of subterranean structure... 2-11 --
Figure 2-12 Floor plan of 94th and 95th floors of WTC 1 showing egress stairways 2-14 --
Figure 2-13 Zone of aircraft impact on the north face of WTC 1. 2-16 --
Figure 2-14 Approximate zone of impact of aircraft on the north face of WTC 1. 2-17 --
Figure 2-15 Impact damage to the north face of WTC 1 2-18 --
Figure 2-16 Impact damage to exterior columns on the north face of WTC 1 2-18 --
Figure 2-17 Approximate debris location on the 91st floor of WTC 1 2-19 --
Figure 2-18 Landing gear found at the corner of West and Rector Streets 2-19 --
Figure 2-19 Redistribution of load after aircraft impact. 2-20 --
Figure 2-20 Expansion of floor slabs and framing results in outward deflection of columns and potential overload 2-25 --
Figure 2-21 Buckling of columns initiated by failure of floor joist connections 2-26 --
Figure 2-22 Catenary action of floor framing on several floors initiates column buckling failures. 2-26 --
Figure 2-23 Aerial photograph of the WTC site after September 11 attack showing adjacent buildings damaged by debris from the collapse of WTC 1 2-28 --
Figure 2-24 Southeast corner of WTC 2 shortly after aircraft impact. 2-28 --
Figure 2-25 Approximate zone of impact of aircraft on the south face of WTC 2. 2-29 --
Figure 2-26 Impact damage to the south and east faces of WTC 2 2-30 --
Figure 2-27 Impact damage to exterior columns on the south face of WTC 2. 2-30 --
Figure 2-28 Conflagration and debris exiting the north wall of WTC 2, behind WTC 1. 2-31 --Figure 2-29 A portion of the fuselage of United Airlines Flight 175 on the roof of WTC 5 2-32 
Figure 2-30 North face of WTC 2 opposite the zone of impact on the south face, behind WTC 1. 2-33 --
Figure 2-31 Plot of column utilization ratio at the 80th floor of WTC 2, viewed looking outward.... The top portion of WTC 2 falls to the east, then south, as viewed from 2-34 --
Figure 2-32 the northeast. 2-36 --
Chapter 3 --
Figure 3-1 Developed north and west elevations. 3-2 --
Figure 3-2 Developed south and east elevations. 3-2 --
Figure 3-3 Typical hotel floor plan. 3-3 --
Figure 3-4 Typical hotel floor framing plan. 3-4 --
Figure 3-5 Typical transverse bracing elevation. 3-5 --
Figure 3-6 Exterior columns from the collapse of WTC 2 falling on the southern part of WTC 3 3-6 --
Figure 3-7 Partial collapse of WTC 3 after collapse of WTC 2. 3-7 --
Figure 3-8 Remains of WTC 3 after collapse of WTC 1 and WTC 2 3-8 --
Chapter 4 Figure 4-1 Typical floor plan for WTC 5. 4-2 --
Figure 4-2 Typical column-tree system (not to scale) 4-3 --
Figure 4-3 Typical interior bay framing in WTC 5. 4-3 --
Figure 4-4 Stairway enclosure core locations in WTC 5 4-4 --
Figure 4-5 Damage to WTC 4 4-5 --
Figure 4-6 Damage to WTC 5 4-5 --
Figure 4-7 Approximate locations of damaged floor areas in WTC 5 4-6 --
Figure 4-8 Damage to WTC 6 4-8 --
Figure 4-9 Impact damage to WTC 6 4-8 --
Figure 4-10 Impact damage to the exterior fa&#xE7;ade of WTC 6 4-9 --
Figure 4-11 WTC 5 fa&#xE7;ade damage 4-10 --
Figure 4-12 Impact damage to WTC 5 4-11 --
Figure 4-13 WTC 5 on fire 4-13 --
Figure 4-14 Deformed beams in WTC 5 4-13 --
Figure 4-15 Unburned bookstore in WTC 5 4-14 --
Figure 4-16 Looking through the door into the undamaged stair tower in WTC S 4-14 --
Figure 4-17 Buckled beam flange and column on the 8th floor of WTC 5 that was weakened by fire 4-15 --
Figure 4-18 Internal collapsed area in WTC 5 4-16 --
Figure 4-19 Internal collapsed area in WTC 5 4-17 --
Figure 4-20 Internal collapsed area in WTC 5 4-18 --
Figure 4-21 Internal collapsed area in WTC 5 with closeup of connection failure at column tree 4-18 --
Figure 4-22 Connection samples 4-19 --
Chapter 5 --
Figure 5-1 Foundation plan - WTC7 5-3 --
Figure 5-2 Plan view of typical floor framing for the 8th through 45th floors 5-4 --
Figure 5-3 Elevations of building and core area 5-5 --
Figure 5-4 Fifth floor diaphragm plan showing T-sections embedded in 14-inch slab 5-6 --
Figure 5-5 3-D diagram showing relations of trusses and transfer girders 5-6 --
Figure 5-6 Seventh floor plan showing locations of transfer trusses and girders 5-7--
Figure 5-7 Truss 1 detail 5-8   --
Figure 5-8 Truss 2 detail 5-9 --
Figure 5-9 Truss 3 detail 5-10
Figure 5-10 Cantilever transfer girder detail 5-11 --
Figure 5-11 Compartmentalization provided by concrete floor slabs 5-12 -- --
Figure 5-12 Sequence of debris generated by collapses of WTC 2, 1, and 7 5-17 --
Figure 5-13 Pedestrian bridge (bottom center) still standing after WTC 2 has collapsed, sending substantial dust and debris onto the street, but before WTC 1 (top center) has collapsed 5-18 --
Figure 5-14 View from the north of the WTC 1 collapse and the spread of debris around WTC7 5-18  --
Figure 5-15 Debris from the collapse of WTC 1 located between WTC 7 (left) and the Verizon building (right) 5-19  --
Figure 5-16 Damage to the southeast corner of WTC 7 (see box), looking from West Street 5-19  --
Figure 5-17 Building damage to the southwest corner and smoke plume from south face of WTC 7, looking from the World Financial Plaza 5-20 --
Figure 5-18 WTC 7, with a large volume of dark smoke rising from it, just visible behind WFC 1 (left) 5-21  --
Figure 5-19 Fires on the 11th and 12th floors of the east face of WTC 7 5-22  --
Figure 5-20 View from the north of WTC 7 with both mechanical penthouses intact 5-24  --
Figure 5-21 East mechanical penthouse collapsed 5-25  --
Figure 5-22 East and now west mechanical penthouses gone 5-25  -- --
Figure 5-23 View from the north of the "kink" or fault developing in WTC 7 5-26  --
Figure 5-24 Areas of potential transfer truss failure 5-27  --
Figure 5-25 Debris cloud from collapse of WTC 7 5-27  --
Figure 5-26 Debris generated after collapse of WTC 7 5-28  --
Chapter 6  --
Figure 6-1 North face of Bankers Trust building with impact damage between floors 8 and 23 6-1  --
Figure 6-2 Closeup of area of partial collapse 6-2  --
Figure 6-3 Floor plan above the 2nd level (ground floor extension not shown) 6-3  --
Figure 6-4 Area of initial impact of debris at the 23rd floor 6-4  --
Figure 6-5 Approximate zones of damage - 19th through 22nd floors, 16th through 18th floors, 11th through 15th floors, and 9th through 10th floors 6-5  --
Figure 6-6 Moment-connected beams to columns 6-7  --
Figure 6-7 Column with the remains of two moment connections 6-7  --
Figure 6-8 Failed shear connection of beam web to column web 6-8  --
Figure 6-9 Suspended column D-8 at the 15th floor 6-8  --
Figure 6-10 Area of collapsed floor slab in bays between C-8, E-8, C-7, and E-7, from 15th floor 6-9  --
Figure 6-11 Bankers Trust Lobby (note debris has been swept into piles) 6-9 --
Figure 6-12 Office at north side of the 8th floor 6-10 --
Figure 6-13 3-D ANSYS model of flange and shear plate moment connection 6-14 --
Figure 6-14 3-D ANSYS model of flange and seat moment connection 6-14 --
Chapter 7  --
Figure 7-1 New York City DDC/DoB Cooperative Building Damage Assessment Map of November 7, 2001 (based on SEANY inspections of September and October 2001) 7-2 --
Figure 7-2 Southeast corner of WFC 3 7-5 --
Figure 7-3 View of Winter Garden damage from West Street, with WTC 1 debris in front of WFC 2 7-6 --
Figure 7-4 View of Winter Garden damage from West Street, with WTC 1 debris leaning against WFC 3 7-6 --
Figure 7-5 Interior damage at floor 20 of WFC 3 7-7  --
Figure 7-6 Verizon building - damage to east elevation (Washington Street) 7-8  --
Figure 7-7 Verizon building - damage to east elevation (Washington Street) due to WTC framing leaning against the building 7-9 --
Figure 7-8 Verizon building - damage to east elevation (Washington Street) 7-9 --
Figure 7-9 Verizon building - column damage on east elevation (Washington Street) 7-10  --
Figure 7-10 Verizon building - damage to south elevation (Vesey Street) 7-11  --
Figure 7-11 Verizon building - localized damage to south elevation (Vesey Street) 7-11  --
Figure 7-12 Verizon building - detail of damage to south elevation (Vesey Street) 7-12  --
Figure 7-13 30 West Broadway - south fa&#xE7;ade, oth floor to roof, looking northeast 7-13  --
Figure 7-14 130 Cedar Street and 90 West Street 7-14  --
Figure 7-15 Interior of 90 West Street showing typical construction features 7-16  --
Figure 7-16 Buckling damage at top of column on floor 8 of 90 West Street 7-17  --
Figure 7-17 Buckling damage at top of column on floor 23 of 90 West Street 7-18  --
Figure 7-18 One Liberty Plaza - south elevation, lower floors 7-19  --
Figure 7-19 One Liberty Plaza - south elevation, upper floors 7-20   --
Appendix A  --
Figure A-1 Heat release rate for office module  A-2 --
Figure A-2 Fire growth rates (from SFPE Handbook of Fire Protection Engineering) A-3 --
Figure A-3 Comparison of exposure temperatures in standard tests A-6 --
Figure A-4 Thermal properties of steel at elevated temperatures A-11 --
Figure A-5 Stress-strain curves for structural steel (ASTM A36) at a range of temperatures A-11 --
Figure A-6 Strength of steel at elevated temperatures A-12 --
Figure A-7 Modulus of elasticity at elevated temperatures for structural steels and steel reinforcing bars A-13 --
Figure A-8 Reduction of the yield strength of cold-formed light-gauge steel at elevated temperatures A-13  --
Figure A-9 Steel temperature rise due to fire exposure for unprotected steel column A-16  --
Figure A-10 Steel temperature rise due to fire exposure for steel column protected with 1 inch of spray-applied fireproofing A-16  --
Figure A-11 The effect of temperature on the modulus of elasticity strength of different types of concretes A-20  --
Figure A-12 Reduction of the compressive strength of two lightweight concretes (one with natural sand) at elevated temperatures A-21  --
Figure A-13 Usual ranges of variation for the volume-specific heat of normal- weight and lightweight concretes A-21  --
Figure A-14 Specific flow rate as a function of density (SPFE Handbook of Fire Protection Engineering) A-25  --
Figure A-15 Estimated evacuation times for high-rise buildings A-26  --
Appendix B  --
Figure B-1 Exterior column end plates B-1  --
Figure B-2 Tensile stress-strain curves for three ASTM-designation steels B-3  --
Figure B-3 Expanded yield portion of the tensile stress-strain curves B-3  --
Figure B-4 Effect of high strain rate on shape of stress-strain diagram B-4  --
Figure B-5 Column tree showing bolt bearing shear failures of spandrel connection B-6 --
Figure B-6 Shear fracture failure of fillet welds connecting a W-shape column to a box core column B-7 --
Figure B-7 Bent and fractured bolts at a column four-bolt connection B-8 --
Figure B-8 Typical truss top chord connections to column/spandrel beam and to the core beam B-10 --
Figure B-9 (A) Visco-elastic damper angles bolted to angle welded to spandrel plate and (B) failed bearing seat connection B-11 --
Figure B-10 (A) Bracket plate welded to the column/spandrel plate and (B) horizontal plate brace with shear connectors welded to the failed bracket B-11 --
Figure B-11 Shear failure of floor joist connections from column / spandrel plate B-12 --
Appendix C  --
Figure C-1 Eroded A36 wide-flange beam C-1  --
Figure C-2 Closeup view of eroded wide-flange beam section C-2  --
Figure C-3 Mounted and polished severely thinned section removed from the wide-flange beam shown in Figure C-1 C-2  --
Figure C-4 Optical microstructure near the steel surface  C-3  --
Figure C-S Another hot corrosion region near the steel surface (etched with 4 percent nital) C-3  --
Figure C-6 Microstructure of A36 steel C4  --
Figure C-7 Deep penetration of liquid into the steel C4  --
Figure C-8 Qualitative chemical analysis C-5  --
Figure C-9 Qualitative chemical analysis C-6  --
Figure C-10 Grain boundary corrosion attack C-6  --
Figure C-11 Microstructure of a typical region showing the surface and grain boundary corrosion attack of Sample 2 C-7  --
Figure C-12 Higher magnification of the region shown in Figure C-10 C-7 --
Figure C-13 Regions where chemical analysis was performed C-8  --
Figure C-14 Gradient of sulfides into the steel from the oxide-metal interface C-12  --
Appendix D  --
Figure D-1 Mixed, unsorted steel upon delivery to salvage yard D-2  --
Figure D-2 Torch cutting of very large pieces into more manageable pieces of a few tons each  D-3  --
Figure D-3 Pile of unsorted mixed steel (background), with sorted, large steel pieces (center) being lifted and cut into smaller pieces (left) D-3  --
Figure D-4 Engineer climbing in unprocessed steel pile to inspect and mark promising pieces D-4  --
Figure D-S Stenciled markings on WTC 2 perimeter column from floors 68-71 D-5  --
Figure D-6 Steel pieces marked "SAVE." D-6  --
Figure D-7 Engineers measuring and recording steel piece dimensions D-6  --
Figure D-8 Engineer measuring spandrel plate thickness (t.) D-7  --
Figure D-9 Measurement of 1/4 inch for web thickness (ty.) D-7  --
Figure D-10 Measured dimensions of the steel pieces
Figure D-11 Burnt steel piece marked for cutting of coupon D-9 --
Figure D-12 Coupon cut from WTC 5 showing web tear-out at bolts D-9 --
Figure D-13 WTC 1 or WTC 2 core column (C-74) D-10 --
Figure D-14 WTC 7 W14 column tree with beams attached to two floors D-11 --
Figure D-15 Built-up member with failure along stitch welding D-11 --
Figure D-16 Engineer inspecting fire damage of perimeter column tree from WTC 1 or WTC 2 D-12 --
Figure D-17 Seat-connected in fire-damaged W14 column from WTC 7 D-12 --
Figure D-18 WTC 1 or WTC 2 floor-truss section with seat connection fractured along welds D-13 --


</subfield>
  </datafield>
  <datafield tag="530" ind1=" " ind2=" ">
    <subfield code="a">Also available via Internet from the web site. Address as of 6/06/02 : http://www.house.gov/science/hot/wtc/wtcreport.htm ; current access is available via PURL</subfield>
  </datafield>
  <datafield tag="610" ind1="2" ind2="0">
    <subfield code="a">World TRade Center  New York, N.Y.</subfield>
    <subfield code="x">Design and construction</subfield>
    <subfield code="2">Local</subfield>
    <subfield code="9">190757</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Skyscraper</subfield>
    <subfield code="z">New York (State)</subfield>
    <subfield code="z">New York</subfield>
    <subfield code="x">Design and construction</subfield>
    <subfield code="2">Local</subfield>
    <subfield code="9">170942</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">September 11 Terrorist Attacks , 2001.</subfield>
    <subfield code="2">Local</subfield>
    <subfield code="9">275985</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Office buildings</subfield>
    <subfield code="x">Fires and fire prevention</subfield>
    <subfield code="z">New York (State)</subfield>
    <subfield code="z">New York</subfield>
    <subfield code="2">Local</subfield>
    <subfield code="9">144526</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Tall buildings</subfield>
    <subfield code="x">Fires and fire prevention</subfield>
    <subfield code="z">New York (State)</subfield>
    <subfield code="z">New York</subfield>
    <subfield code="2">Local</subfield>
    <subfield code="9">176715</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Building failures</subfield>
    <subfield code="z">New York (State)</subfield>
    <subfield code="z">New York</subfield>
    <subfield code="2">Local</subfield>
    <subfield code="9">66560</subfield>
  </datafield>
  <datafield tag="700" ind1="1" ind2="0">
    <subfield code="a">McAllister, Therese</subfield>
    <subfield code="9">133355</subfield>
  </datafield>
  <datafield tag="700" ind1="1" ind2="0">
    <subfield code="a">Corley, Gene</subfield>
    <subfield code="9">80820</subfield>
  </datafield>
  <datafield tag="710" ind1="1" ind2=" ">
    <subfield code="a">United States</subfield>
    <subfield code="b">Federal Insurance and Mitigation Administration</subfield>
    <subfield code="9">182913</subfield>
  </datafield>
  <datafield tag="710" ind1="2" ind2=" ">
    <subfield code="a">Greenhorne &amp; O'Mara</subfield>
    <subfield code="9">105648</subfield>
  </datafield>
  <datafield tag="710" ind1="1" ind2=" ">
    <subfield code="a">United States</subfield>
    <subfield code="b">Federal Emergency Management Agency.</subfield>
    <subfield code="b">Region II</subfield>
    <subfield code="9">182913</subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="c">6</subfield>
    <subfield code="h">HD7293</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="k">General</subfield>
    <subfield code="m">L5567 2002</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">188673</subfield>
    <subfield code="d">188673</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="8">beal</subfield>
    <subfield code="a">4</subfield>
    <subfield code="b">4</subfield>
    <subfield code="c">33</subfield>
    <subfield code="d">2016-05-27</subfield>
    <subfield code="e">US. Gov.</subfield>
    <subfield code="g">55.00</subfield>
    <subfield code="i">369653</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">General HD7293 L567 2002</subfield>
    <subfield code="p">91000000015552</subfield>
    <subfield code="r">2016-05-27 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="v">65.00</subfield>
    <subfield code="y">6</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">ddc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="8">evci</subfield>
    <subfield code="a">10</subfield>
    <subfield code="b">10</subfield>
    <subfield code="c">1</subfield>
    <subfield code="d">2016-05-27</subfield>
    <subfield code="e">Federal Depository</subfield>
    <subfield code="h">2002</subfield>
    <subfield code="i">379692</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">720.4837471 W92711</subfield>
    <subfield code="p">80000002201948</subfield>
    <subfield code="r">2016-05-27 00:00:00</subfield>
    <subfield code="t"> </subfield>
    <subfield code="y">6</subfield>
  </datafield>
</record>
